Letters & Submissions

9 September 2022
The GEG review below, (with input from Friends of Latrobe Water and EJA ) was wilfully ignored by Gippsland Ports/DEECA. Basically, the entrance dredging at Lakes Entrance is too deep – and is one of the causes of the Gippsland lakes system becoming ‘marine’ instead of brackish (ie; too salty for the Lakes plants and animals to thrive – or survive in some cases). Ports claims of “long term monitoring” are a farce.


July 2021


10.12.2021
GEG-submission-on-CGSWS-Discussion-Draft


6.10.2020
Presentation by GEG to EJA re Lakes salinity problems.